Following documents have been submitted for regulation work in CEPT ECC SE43 from WISE partners
13th SE43 meeting, Paris, France, March 2012:
SE43(12)15 PMSE sensitivity degradation measurements (Nokia, Wise-project)
12th SE43 meeting, Cambridge, UK, December 2011:
11th SE43 meeting, Lisbon, Portugal, September 2011:
SE43(11)68 Database security and reliability (Fairspectrum)
10th SE43 meeting, Bologna, Italy, July 2011:
SE43(11)Info 08 WSD Maximum Power Measurement Report (WISE partners)
SE43(11)36 WSD Maximum Power Considerations (Nokia, Fairspectrum and Ficora)
Other reports: